Sugar Factory Frauenfeld, Silo 6 – Tuchschmid

*Satisfaction thanks to single-source delivery: Design, Production, Installation.

*Walter Luessi / Head of Constructa

Sugar Factory Frauenfeld, Silo 6

17.07.2013

The extraordinary installation with the help of a 500 ton crane on site of the sugar factory in Frauenfeld began sucessfully: The first part of the 54 m long steel conveyer bridge was put on the 51 high stair tower. It connects the new silo 6 with the existing silo 5.