Performance Enhancement Railway Station Winterthur – Tuchschmid

*Building with the material of the modern architecture is our passion.

*Heinz Huber / Head of Assembly

Performance Enhancement Railway Station Winterthur

28.02.2018

In the night of 27th to the 28th February 2018, Tuchschmid installed the 45 tons heavy and up to 5.5 m wide bridge sections for the performance enhancement at the railway station in Winterthur. Listen to the report of Radio Top: