*Satisfaction thanks to single-source delivery: Design, Production, Installation.

*Walter Luessi / Head of Consulting and Development

Performance Enhancement Railway Station Winterthur

28.02.2018

In the night of 27th to the 28th February 2018, Tuchschmid installed the 45 tons heavy and up to 5.5 m wide bridge sections for the performance enhancement at the railway station in Winterthur. Listen to the report of Radio Top: